Local Government

Sensors installed at two Norfolk bridges in corrosion-monitoring trial

Norfolk County Council is testing whether data from inside concrete structures can support bridge inspections and maintenance decisions.

Corrosion-monitoring sensors have been installed at two bridges in Norfolk as part of a trial involving Norfolk County Council and Dublin-based specialist Structivate.

The installations took place between 27 and 29 October at Morton’s Bridge near Outwell and Rungay’s Bridge in Marshland St James. The trial will assess whether measurements collected from within existing concrete can provide additional information to bridge engineers.

Monitoring between inspections

Structivate’s SM:ART system combines retrofitted sensors with an online platform. It records half-cell potential and concrete resistivity, together with temperature and humidity, and transmits readings via a mobile network for review between site visits.

The system is intended to complement visual inspections and targeted testing, rather than replace established bridge assessment methods. Engineers can compare readings over time with observations and other findings from site investigations.

Half-cell potential can help indicate the likelihood of corrosion activity in reinforcement, while resistivity provides information about the conditions in which corrosion may occur. Temperature and moisture can affect these electrical measurements, meaning changes require interpretation in context.

Supporting bridge management

Reinforced-concrete bridges can develop corrosion when chlorides or carbonation weaken the protection normally provided by the concrete. The deterioration may reduce the cross-section of steel reinforcement and lead to cracking or spalling before the full extent of the problem is visible at the surface.

The Norfolk trial will examine how internal measurements can help identify locations requiring closer investigation and support decisions on maintenance or repair. Any assessment will also need to consider each bridge’s construction, exposure, maintenance history and other inspection or testing results.

The installation follows SM:ART’s first live deployment at Lifford Bridge in Ireland in July 2026.