Rail

Rail teams deploy leaf-fall operation after 101,000 minutes of delays

Northern, TransPennine Express and Network Rail are using treatment trains, driver briefings and enhanced inspections to tackle slippery rails across the North.

Rail teams across the North are deploying specialist trains, additional inspections and revised driving practices to manage the impact of autumn leaf fall.

When wet leaves are crushed beneath train wheels, they form a thin layer on the rail that reduces adhesion. The effect is often compared with black ice, requiring drivers to accelerate more carefully and brake earlier.

Northern and TransPennine Express recorded a combined 6,405 incidents and more than 101,000 minutes of delay linked to autumn conditions in 2025.

Specialist trains and track treatment

Network Rail has six multi-purpose vehicles and one rail head treatment train operating in the North West. Together, they cover more than 100,000 miles of treatment each year.

In the North East, four rail head treatment trains are scheduled to cover 95,000 miles between October and December 2026.

The trains use powerful jets of water to remove leaf matter from the rails before applying an adhesion modifier to improve grip. Network Rail also uses about 20,000 litres of Alleviate, a sand-and-glue mixture applied by lineside machines, each year. Around 250 containers of dry sand, known as “sand bombs”, are available for reactive use when trains struggle to accelerate.

More than 5,000 inspections are carried out annually by Network Rail in the North West to identify wet leaves on the line.

Louise Tilly, Network Rail’s Seasons Delivery Manager, said: “Leaves might not sound like much of a problem, but once they’re crushed onto the rail they can create very slippery conditions, so a huge amount of work goes into keeping the railway moving during autumn.

“Our specialist leaf-busting trains travel across the network using powerful jets of water to wash leaf matter from the rails. We can then apply adhesion modifier to help improve grip for trains. It’s all about staying ahead of the conditions and making sure we’re treating the railway where it’s needed most.”

Driver and train preparation

Northern briefs drivers on routes with a higher risk of low adhesion before the autumn season. Trains are also fitted with sanders that release a short burst of sand between the wheel and rail to improve traction.

Mark Jones, a Driver Team Leader at Northern, said: “In the lead-up to autumn, we brief all our drivers on the routes they drive to make sure they’re aware of the low-adhesion areas.

“The trains are built to operate in these conditions, but when it’s a particularly bad day, drivers will drive a little slower and brake a little earlier.”

Low adhesion can cause wheels to slide and develop flat spots. Obi Ibitoye, an engineer at a Northern traincare centre, said affected trains are sent to a wheel pit so the damaged sections can be removed.

“During autumn, the conditions are harsher and there can be more wear on the wheels. Leaves accumulating on the tracks can cause the wheels to slide, which can lead to flat spots,” he said.

Managing disruption

Controllers at train operators manage service disruption when autumn conditions affect the network. Kieron Riley, a controller at TransPennine Express, said the role included keeping customers informed and helping them reach their destinations as quickly as possible.

“There may be times where, because of the impact of leaves on the line, we may have delays on the network,” Riley said. “So it is our job to manage those delays, make sure customers are aware and get them from A to B as quickly as possible.”

Northern, TransPennine Express and Network Rail have launched a joint campaign, “It’s not just a leaf”, to explain the work carried out by drivers, engineers, controllers and track teams during the leaf-fall season.

Bradley Hayes, Northern’s Campaigns Manager, said the campaign was intended to address the perception that leaves on the line were merely a joke and to explain how compressed wet leaves can cause trains to slide, increasing braking distances and journey times.