Rail

£4.8m backs 23 rail innovations including bridge scanner and safety wearable

The Department for Transport-funded First of a Kind programme will test technologies aimed at improving railway safety, maintenance and resilience.

Twenty-three rail innovation projects are to receive a share of £4.8m in funding to test technologies designed to improve safety, maintenance and resilience across the UK network.

The grants have been awarded through the Department for Transport’s First of a Kind competition, delivered with Innovate UK and the rail industry. Successful projects will test their ideas in operational railway environments, potentially improving their prospects of adoption by train operators, freight companies, Transport for London, HS2 and Network Rail.

Bridge inspections and worker protection

Among the selected projects is SAIN, a portable device that records the acoustic response of bridges as trains pass. Its developers say the technology can identify hidden structural defects, with the potential to improve safety and reduce disruption linked to infrastructure problems.

ZoneWarden is a wearable alert system for staff working in hazardous areas. It is intended to warn users when they approach dangerous zones and to monitor exposure to fatigue, noise, vibration and dust.

Another successful project, Habitat Wall, is designed to support biodiversity alongside railway infrastructure work. Its cavities and textured surfaces provide shelter and nesting areas for birds, insects, small mammals and amphibians, while integrated pockets allow plants to grow.

Rail Minister Lord Hendy said: “Our modern railway needs bold thinking, and the First of a Kind competition is helping the best ideas get to work on the network so that passengers and freight can feel the day-to-day benefits.

“Investing in world-leading technology and embracing innovation is exactly how we build a safer, more reliable railway that is ready for the future as we establish Great British Railways, which will deliver growth, jobs and homes in every part of the country.”

Previous projects already in use

The First of a Kind competition began in 2017. Previous projects cited by the programme include CoCatalyst’s technology for clearing leaves from the railway, which has been used to reduce disruption to passenger services, and Signapse’s artificial intelligence system for translating timetable and travel information into British Sign Language. Signapse has been used across the network by the Rail Delivery Group and Network Rail.

Siemens Mobility Limited and Porterbrook have also developed a rapid-charging system to support railway electrification at the Long Marston Rail Innovation Centre.

Projects selected in 2025 include Furrer+Frey’s AERIAL system, which uses satellite imagery and artificial intelligence to map bridges, tunnels, platforms and other railway structures. The resulting data can help engineers design overhead line equipment without relying on slower and more expensive trackside surveys. The project has already generated savings for Network Rail and other UK infrastructure projects, according to the programme.

Robok’s SiteFlow uses existing CCTV cameras to track the movement of suppliers and vehicles around construction sites. The system was tested at an HS2 site to help identify gate delays, plan deliveries and maintain project progress, and the company plans to offer it to other HS2 and UK infrastructure projects.

Claire Spooner, director of Innovation as a Service at Innovate UK, said: “Innovation is essential to building a railway that is more reliable, sustainable and responsive to the needs of passengers and industry. Through the First of a Kind Rail programme, delivered by Innovate UK on behalf of the Department for Transport, businesses are supported to develop and demonstrate outstanding, innovative solutions with the potential to transform the rail sector and deliver lasting benefits.

“These projects show the strength of innovation across the UK and provide an important opportunity to test solutions in real-world settings, helping to accelerate adoption and deliver benefits more quickly.”

The 23 successful projects have begun work, with testing scheduled to take place over the coming months.